Project | Cost | Completion | Services Provided | Project Description |
---|---|---|---|---|
Football Stadium East End, Tortola | $5M | 2017 | Civil & Structural design | Structural design of new 2000 seat stadium with very large cantilevered roof structures. |
Water’s Edge Office Building Wickham’s Cay II, Tortola | $3M | 2017 | Structural designs | Designs for new 4 story office building on piled foundations at Wickham’s Cay II. |
VIHA Elderly Housing St. Thomas | $20M | 06/15 | Structural designs | 90 apartments for senior housing on St. Thomas. 2 buildings in reinforced concrete moment frames. |
Nanny Cay Resort and Marina New Condominium Buildings | $30M | First 2 buildings start construction March 2017 | Structural design | New 5 story condominium buildings on piled foundations on reclaimed land. |
Scrub Island Resort BVI | $100M | 06/2009 | Civil & Structural design | New resort on uninhabited island. 88 keys including $ 4M pool complex. |
Sir Richard Branson’s private resort on Mosquito Island | $16M | 12/2014 | Civil & Structural design | Two identical Villas and Main House, very high end. We have 206 Architectural, Engineering, MEP and Pool drawings for Villas alone. |
Anna’s Hope Residences on St. Croix | $10M | 08/2014 | Structural design | 20 buildings with 2 and 3 bedroom apartments and some retaining walls. |
Magen’s Junction Apartments St. Thomas USVI Phase I | $20M | 11/2017 | Structural design | 2 new 6 story apartment buildings with a pool and community center in a connected 6 story tower between the apartment buildings. |
Brandywine Bay Marina Suites Tortola | $5M | Construction started February 2017 on first building | Structural design of high end duplex buildings and docks. | 5 Buildings partially in the sea designed in reinforced concrete and blockwork. Project includes a dock with a slip for each unit. |
Hanger at Cyril King Airport St Thomas | $3M | 2017 | Structural designs | Design for a new hanger at the airport on St Thomas with 260 ft clear span. |
Peebles Hospital B.V.I. | $65M | 12/2014 | Civil and structural design Site supervision of civil and structural works. | New 7 story hospital on very steep site. 155,000 sq ft. in steel special moment frames. |
Maria’s Hotel Expansion BVI | $10M | 2/2012 | Structural design | New 5 story office building with piled foundations in Road Town. |
Business Continuity Center BVI | $12M | 06/2010 | Structural design. | New 3 story office building in Road Town. |
Dawson Office Building Wickham’s Cay II, Tortola | $3M | March 2017 | Structural designs | Designs for new 4 story office building at the outskirts of Road Town. |
Nanny Cay Resort & Marina BVI – New Townhouses | $20M | 4/2014 | Structural designs | 3 story townhouse buildings on piled foundations. |
Veterans Housing Project St. Thomas USVI | $19M | 12/2006 | Civil & structural design. | New housing complex comprising 13 3 story bungalows and one 6 story building. |